EN 12350-1 PDF

DRAFT. prEN August ICS Will supersede EN English Version. Testing fresh concrete – Part 1: Sampling and common. EUROPEAN STANDARD FINAL DRAFT NORME EUROPÉENNE prEN EUROPÄISCHE NORM June ICS Will supersede EN. BS EN Testing fresh concrete. Sampling (British Standard) This European Standard specifies two procedures for sampling fresh concrete by.

Author: Kigam Shazil
Country: Lithuania
Language: English (Spanish)
Genre: Art
Published (Last): 7 November 2018
Pages: 101
PDF File Size: 5.85 Mb
ePub File Size: 2.6 Mb
ISBN: 716-1-97434-513-1
Downloads: 45922
Price: Free* [*Free Regsitration Required]
Uploader: Dizil

When mixing and sampling of concrete is done 12350-11 a laboratory, different procedures may be required. This European Standard specifies two procedures for sampling fresh concrete, by composite sampling and by spot sampling. Take the scoopfuls of concrete through the moving stream from truck mixer. When mixing and sampling of concrete is done in a laboratory, different procedures may be required.

The time for this to occur depends on the concrete 123500-1, cement type, mix proportions, the use of admixtures with set retarding properties and consistency of the concrete.

Click to learn more. Worldwide Standards We can source any standard from anywhere in the world. Significance and Use Provides standardized requirements for making, curing, protecting and transporting concrete specimens. Find Similar Items Enn product falls into the following categories. Using the scoop take the required number of increments uniformly distributed throughout the batch.

Take at least 1,5 times the quantity estimated as being required for the tests. The report may include: Take precautions to avoid dry cement entering the eyes, mouth and nose whilst mixing concrete. Report from the sample includes: Due to the shape of the mold, the rod must be em in first layer while rodding around the 1350-1 of the cone. Using the scoop take the increment s from the required part of a batch or mass of concrete. Transport of test specimens Avoid loss of moisture and deviations 123550-1 the required temperature at all stages of transport.

  INVISIBLE AUGUST BRUGUERA PDF

Deposit the increment s in the container. The most common method used in the sampling for casting with large volume of concrete is the spot sampling which is less 13250-1 intensive due to the rate of pouring. NOTE The requirement for remixing the sample before tests on the fresh concrete, or before making test specimens, is included in the relevant standards. In some big projects, imagine the time consumed to perform the composite sampling when there is a lot of concrete truck mixers in queue at the checkpoint area.

Foreword Scope Normative references Terms and definitions Apparatus Sampling Report of sampling See more standards on testing concrete. Procedure for Slump Test Apparatus being readied for slump test activity Fill the mold in 1235-01 layers of approximately equal height. After compaction of each layer, tap the sides of the container smartly with the mallet until large bubbles of air cease to appear on the surface and depressions left by the compacting rod or bar, are removed.

The requirement for remixing the sample before tests on the fresh concrete, or before making test specimens, is included in the relevant standards. This standard is also available to be included in Standards Subscriptions.

  DUNCAN BANNATYNE WAKE UP AND CHANGE YOUR LIFE PDF

Sampling BS EN specifies two procedures for sampling fresh concrete, by composite sampling and by spot sampling. Notify me of new comments via email. Air content — Pressure methods.

BS EN – Testing fresh concrete. Sampling – BSI British Standards

Menu Home Blog About Contact. Records shall be kept to ensure the traceability of the specimen from sampling to testing. NOTE The properties of fresh concrete change with time after mixing, depending upon the environmental conditions.

You are commenting using your Facebook account.

Sampling of Freshly Mixed Concrete at the Field (BS EN ) – QA/QC Construction

Minimum size of sample x 1. Quantity at least 1.

Composite samples are not required if the only purpose of obtaining the sample is to determine the temperature. Leave the TMD 13250-1 the concrete a minimum of 2 min. Difference of the two samplings — Composite sampling is more diverse as it is the representative of the whole truck load. Remember me on this computer.

BS EN 12350-1:2009

Full compaction is achieved using mechanical vibration, when there no further appearance of large air bubbles on the surface of the concrete and the surface becomes relatively smooth with a glazed appearance, without excessive segregation.

Disregard the 12530-1 part and the last part of the load and take at least 4 increments. The first school of thought is rather straightforward: